Saturday 5 July 2014

Day 200

Painting started about 2 weeks ago. Our SS uses a particular painter to do the whole job  and will take about 3 weeks.

We also received the fixing stage payment request 2 weeks ago, which is 25% of the build cost.

In the meantime, we have been organising landscapers to come over and give us some ideas and cost of landscaping our ideal garden.

Here are some pics of the progress:


Staircase

Staircase

Upstairs leisure room

Entry

Study room

Family room

Hallway


An inlet pipe from the gas main in the street was connected and then located to the front RHS of the property. Gas meter connection to the gas outlet should be soon. Noticed the electrical wire (white wires on the left side of photo) is very close to the gas inlet. Is this safe???



No comments:

Post a Comment