Plastering commenced 3 weeks ago followed by delivery of the cabinets. Lock up has occurred along with the payment request. Painting will be starting very soon.
Here are some pictures:
 |
Family room |
 |
View of outdoor area |
 |
Dining area |
 |
Hallway |
 |
Temporary ladder to upstairs |
 |
Bathroom |
 |
Doors delivered |
 |
Kitchen with cabinetry |
 |
Kitchen |
 |
Kitchen |
 |
Laundry cabinetry |
 |
Staircase! |
 |
Stairscase |
 |
Bathroom with waterproofing |
 |
Main bedroom ensuite |
More pictures with the brickwork repairs and still more to go.
 |
Brickwork removed due to bowing of the brickwork above the window. |
 |
Brickwork done with support. |
 |
Brickwork repaired at base of pillar after a big chunk was removed with a bobcat |