Plastering commenced 3 weeks ago followed by delivery of the cabinets. Lock up has occurred along with the payment request. Painting will be starting very soon.
Here are some pictures:
|
Family room |
|
View of outdoor area |
|
Dining area |
|
Hallway |
|
Temporary ladder to upstairs |
|
Bathroom |
|
Doors delivered |
|
Kitchen with cabinetry |
|
Kitchen |
|
Kitchen |
|
Laundry cabinetry |
|
Staircase! |
|
Stairscase |
|
Bathroom with waterproofing |
|
Main bedroom ensuite |
More pictures with the brickwork repairs and still more to go.
|
Brickwork removed due to bowing of the brickwork above the window. |
|
Brickwork done with support. |
|
Brickwork repaired at base of pillar after a big chunk was removed with a bobcat |